Korterelamute ehitustööde organiseerimine

Klap, Carolin (2020) Korterelamute ehitustööde organiseerimine. [thesis] [en] Organising the Construction Works of Apartment Buildings.

[thumbnail of digidoc] Other (digidoc) - Published Version
Restricted to Registered users only

Download (5MB)
[thumbnail of retsensioon - digidoc] Other (retsensioon - digidoc) - Published Version
Restricted to repository personnel only

Download (23kB)

Abstract

Käesoleva lõputöö eesmärgiks oli lahendada Kuukressi tee 1/3/5/7/9 korterelamute ehituse organiseerimise projekt. Lõputöö lähteandmed võeti Arhitektuuribüroo Korrus Osaühingu koostatud arhitektuurse põhiprojekti seletuskirjast. Lõputöös koostati nulltsüklitööde ja katusetööde tehnoloogiakaardid, lisaks ehitusplatsi üldplaan. Autor koostas tööde teostamiseks kalendergraafiku põhinedes Eke Nora, Ratu ning Ramm Ehituse eelnevate sarnaste projektide tööetappide ajanormidele. Ehituse eelarve tabelina on kasutatud Ramm Ehitus OÜ poolt koostatud eelarvetabelit. Autor on lahendanud käesolevas töös nulltsüklitööde ja hoone katusetööde organiseerimise. Teemade kohta on koostatud seletuskirjad, mis käsitlevad tööde teostamiseks vajaliku informatsiooni: vajaminevaid ehitusmasinaid ja nende liikumist platsil, tööde ajalisi kestvusi ning nende mahte. Korterelamute ehitamine kestab 382 päeva. Ehitustööd algavad 3. juunil 2019 ja lõppevad 17. novembril 2020. Ehitusmaksumuseks ilma käibemaksuta kujunes 4 972 635 €. Objekti organiseerimiskuludeks saadi 278 111 €, mis moodustab kogumaksumusest 5,6%.

Abstract [en]

The aim of this thesis was to solve the project of organising the construction of apartment buildings on Kuukressi tee 1/3/5/7/9. The basic data of the thesis were taken from the explanatory letter of the main architectural project prepared by the architectural office Korrus Osaühing. In the thesis, technology maps of zero-cycle works and roof works were prepared, in addition to the general plan of the construction site. The author compiled a calendar schedule for the execution of the works based on the time norms of the previous stages of similar projects of Eke Nora, Ratu and Ramm Ehitus. The budget table prepared by Ramm Ehitus OÜ has been used as the construction budget table. In this work, the author has solved the organisation of zero-cycle works and roof works of the building. Explanatory notes have been prepared on the topics, which concern the information necessary for the performance of the works: the needed construction machines and their movement on the site, the duration of the works and their volumes. The construction of apartment buildings takes 382 days. Construction work will commence on 3 June 2019 and end on 17 November 2020. The construction cost excluding VAT was 4,392,635 euros. The organisation costs of the object amounted to 278,111 euros, which is 5.6% of the total cost.

Item Type: thesis
Advisor: Anneli Ramjalg
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Institute of Construction > Building Construction
Depositing User: Carolin Klap
Date Deposited: 16 Sep 2020 10:32
Last Modified: 16 Sep 2020 10:32
URI: https://eprints.tktk.ee/id/eprint/5634

Actions (login required)

View Item View Item