TTK Links: Home Page | TTK Moodle | ÕIS
TTK/UAS Repository For Digital Teaching and Learning Resources

Tänava rekonstrueerimise projekti- ja ehitusprotsessi analüüs

Ojasalu, Ivari (2020) Tänava rekonstrueerimise projekti- ja ehitusprotsessi analüüs. [thesis] [en] Analysis of a Construction Project and the Construction Process.

[img] PDF - Published Version
Restricted to Registered users only

Download (3MB)
[img] Other (Retsensioon - digidoc) - Other
Restricted to repository personnel only

Download (23kB)

Abstract

Autor on lõputöös uurinud tänava ehitust ning rekonstreerimist korralduslikust seisukohast.Uuritavaks objektiks oli manufaktuuri tänava ehitus milles kirjeldakse erinevaid ehitusprotsesse.Uuritavad ehitusprotsessid olid muldkeha ehitus,killustikaluse ehitus ning asfalteerimistööd. Peale tööde analüüsimist suutis autor valida parimad lahendused ning tehnikapargi mida kasutada töödel.Tööde teostamisel tuleb esimeseks prioriteediks seada kvaliteet ning järgnevaks prioriteediks objekti kasum.Kvaliteedi arvelt ei tohi tulla objekti kasum.Objekti kasum tuleb saavutada kvaliteetse juhtimise ning parima tehnilise lahenduse leidmisega.Kvaliteedi ja kasumi saavutamise juures on oluline täpsus ning detailideni läbi mõeldud eelarve, sellepärast ongi iga peatüki juures tehtud arvutused iga töö maksumuse kohta. Lõputöö andis suurepärase kogemuse kuidas on võimalik hästi planeerides saavutada nii objekti kasum ning mitte seda saavutada kvaliteedi arvelt.Tänased insenerid peavad olema suutelised mõtlema ja leidma suurepäraseid lahendusi ning oskama võimalikult efektiivselt ehitada.

Abstract [en]

The author of this thesis has studied the construction and reconstruction of the street from the organizational point of view. The object of research was the construction of manufaktuuri street which describes various construction processes. The construction processes studied were embankment construction, crushed stone construction and asphalting work. After analyzing the works, the author was able to choose the best solutions and the technical park to use in the works. When performing the work, the first priority must be the quality and the next the profit of the object. The profit must not come at the expense of quality. The profit must be achieved by high-quality management and finding the best technical solutions. Accuracy and a well-thought-out budget are important for achieving quality and profit, which is why the calculations for every work have been made for in the chapters. The dissertation gave a great experience of how it is possible to achieve both the quality and the profit of the object by planning well. Today's engineers need to be able to think and find great solutions and build as efficiently as possible.

Item Type: thesis
Advisor: Mati Toome
Subjects: Construction > Road Construction > Road design
Divisions: Institute of Construction > Road Construction
Depositing User: Ivari Ojasalu
Date Deposited: 21 Sep 2020 08:35
Last Modified: 21 Sep 2020 08:35
URI: http://eprints.tktk.ee/id/eprint/5662

Actions (login required)

View Item View Item