TTK Links: Home Page | TTK Moodle | ÕIS
TTK/UAS Repository For Digital Teaching and Learning Resources

Riigimaantee nr 6 Valga - Uulu km 75,130 - 82,790 rekonstrueerimise töökorralduse projekt

Vihmoja, Tõnis (2019) Riigimaantee nr 6 Valga - Uulu km 75,130 - 82,790 rekonstrueerimise töökorralduse projekt. [thesis] [en] Construction Management Project for Reconstruction of Sate Road no.6 Valga - Uulu km 75.130 - 82.790.

[img] PDF - Published Version
Restricted to Registered users only

Download (2MB)
[img] Microsoft Word (lihtlitsents) - Other
Restricted to Registered users only

Download (14kB)

Abstract

Lõputöö eesmärgiks oli korraldada rekonstrueerimise ehitustöid Valga - Uulu maanteel km 75,130 - 82,790. Arvestada tuli töödeks ette nähtud mahtudega ja tööde olemusega. Sellest lähtuvalt valiti sobivad masinad ning tööjõud tööde tegemiseks. Kõikide tööde kohta leiti sobilik tootlikus ning arvutati välja tööle kuluv aeg, mis oli hiljem abiks kalendergraafiku koostamisel. Tööd tehakse ära kahes etapis. Tööde tegemisteks arvestatati 10 h tööpäevadega, ainuke erand oli killustikaluse ja freespuru kihi ehitamisel, mil tööpäeva pikkuseks arvestati 12 h. Tööd toimuvad avatud meetodil. Kui igat tööd eraldi päevana arvestada kulub ehitusobjekti ettevalmistus töödeks 15 päeva, mullatöödeks 133 päeva, katendi ehituseks 154 päeva, drenaaži ja truupide töödeks 16 päeva, tehnovõrkude töödeks 13 päeva, liikluskorraldus- ja ohutusvahendite paigalduseks 16 päeva ja maastikukujundustöödeks 24 päeva. Reaalselt ehitustööde tegemisel ja kalendergraafiku koostamisel arvestatakse, et mitut tööd saab päeva jooksul korraga teha ja sellest tulenevalt vähenevad töödele kuluvad ajad märkimisväärselt. Täpset töödele kuluvat aega näeb kalendergraafikust (lisa 1, lisa 2). Tööd tuleb ära teha 4 kuu jooksul, mis saab ka täidetud. Tööd kestavad esimesest maist kuni 27 augustini. 7 tööpäeva jääb graafikus varuna. Peale objekti valmimist suureneb Valga – Uulu maanteelõigul liiklusohutus, kandevõime ning paraneb märkimisväärselt sõidumugavus.

Abstract [en]

The purpose of this thesis was to organise a reconstruction site on the Valga - Uulu highway from km 75,130 - 82,790. This task had to take into consideration both the nature and limitations of the site which then helped to determine the appropriate machinery as well as employment required for the job. Rate of production was measured in order to comprehend the time required for job within the reconstruction and create a calendar, scheduling the length of each task. The project was divided into two parts. Each day totalled in 10 h shifts with the exception of days involing the placement of crushed stone and milling coat layer which required 12 h days, respectively. The job is executed as open method. If one was to consider each job as a separate day, these would require the following times: 15 days for the preparation works of the construction site, 133 days for soil works, 154 days for pavement works, 16 days for drainage works, 13 days to construct techno networks, 16 days for road and safety sign placements and 24 days for landscaping works. It is also considered that work-efficiency on the site is increased compared to the scheduled times as many jobs can take place simultaneously and consequently, the time required to finalise the project decreases sufficiently. The designated time for each practical job is seen in the appendix of the calendar. A total of 4 months was allocated to completing the project and this was satisfied as 7 additional days were spared from the calendar. Works are being done from first may to the twenty first of august. After the completion of the project, increased road safety, maximum authorised mass as well as notably increased driving quality is expected on the Valga - Uulu highway.

Item Type: thesis
Advisor: Ragnar Kukk
Subjects: Construction > Road Construction > Road building > Road building work
Divisions: Institute of Construction > Road Construction
Depositing User: Tõnis Vihmoja
Date Deposited: 05 Jun 2019 08:19
Last Modified: 26 Aug 2019 07:41
URI: http://eprints.tktk.ee/id/eprint/4658

Actions (login required)

View Item View Item