Korterelamu ehitustööde organiseerimine

Turkin, Jargo (2019) Korterelamu ehitustööde organiseerimine. [thesis] [en] Organizing the Construction of the Apartment Building.

[img]
Preview
PDF - Published Version
Download (11MB) | Preview
[img] Other (retsensioon) - Other
Restricted to repository personnel only

Download (395kB)

Abstract

Käesolev lõputöö koostamise aluseks on Sooja tänav 2, Saue korterelamu ehitustööde projekt. Lõputöö raames koostati ehitustööde organiseerimise projekt müüritööde ja katusetööde tehnoloogiakaartidega. Ehitustööde alguseks on 07. mai 2018 ja ehitustööd lõpetatakse 15. november 2019. Ehitustööde kogumaksumuseks oli 2 139 572 eurot millele lisandub käibemaks. Suurimaks tööliste arvuks kujunes 32 inimest, selle perioodi kestvus on 3 nädalat. Alltöövõtjatele on planeeritud neli soojakut ja peatöövõtjale kolm soojakut. Ehitusplatsil on arvestatud ka mõningase varuga. Müüritööde tehnoloogiakaardil teostati kortermaja teise korruse müüritööd kus toodi välja vajaminev inimtööjõu hulk, vajalike masinate jõudlus ja teostamise ajagraafik. Katusetööde tehnoloogiakaardil toodi välja erinevate tööde teostuse etapid, soojustuse paigaldus viis ja katusekatte nõuetekohane paigaldamine. Katusetööde läbiviimiseks leiti vajaminev tööjõu hulk ja sobiv tõstemehhanism materjalide tõstetööks. Eelarvestuse peatükis leiti ehitustööde kestvus eelnevalt koostatud mahtude ja eelarve tabeli järgi. Kasutatud ajanormi on leitud RATU- kaartide ja EKE NORA andmetest.

Abstract [en]

This graduation thesis was prepared based on the construction project for the apartment building at Sooja 2, Saue, Estonia. Within the framework of the thesis, a project as pertaining to organization of construction was devised including masonry and roofing work technology maps. Construction commenced on May 7, 2018 and will be completed on November 15, 2019. The total cost of relevant construction is set at 2,139,572 euros plus value added tax. As the maximum number of workers, 32 people were employed for a duration of three weeks. Four heated shelters were planned for subcontractor use and three for general contractor purposes. Some extra space was left for relevant purposes on the construction site. The masonry technology map sets out implementation of masonry work on the second floor of the apartment building, listing required manpower, performance of required machinery, and the time schedule for actual implementation. The roofing work technology map provides for implementation stages of various work, installation methods for heating, and due installation of roofing. For the purpose of carrying out roofing work, the required amount of manpower was found as well as the best suited hoisting mechanism for lifting relevant materials. In the budgeting chapter, the duration of relevant construction work is calculated based on a preprepared volume and budget table. The time allowance applied was calculated based on data on RATU maps and by OÜ EKE NORA.

Item Type: thesis
Advisor: Veljo Kanemägi
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Institute of Construction > Building Construction