TTK Links: Home Page | TTK Moodle | ÕIS
TTK/UAS Repository For Digital Teaching and Learning Resources

Tugimaantee 90 Põlva-Karisilla km 0,290-11,295 rekonstrueerimise ehituskorralduse projekt

Plato, Erki (2019) Tugimaantee 90 Põlva-Karisilla km 0,290-11,295 rekonstrueerimise ehituskorralduse projekt. [thesis] [en] Construction management project for main road nr 90 Põlva – Karisilla kilometers 0,290 – 11,295..

[img]
Preview
PDF - Published Version
Download (1MB) | Preview
[img]
Preview
PDF (lihtlitsents) - Other
Download (30kB) | Preview

Abstract

Lõputööna valminud tugimaantee 90 Põlva – Karisilla km 0,290-11,295 rekonstrueerimise ehituskorralduse projekt on suureks abiks projekti meeskonnale ehitustööde planeerimisel ja teostamisel kogu objekti vältel. Lõputöös välja toodud ressursside vajadus ja kalendergraafik võimaldab varakult vajamineva masinapargi komplekteerimise erinevatele ehitusetappidele. Lõputöös on välja toodud ehitusobjekti suuremad tööd nagu metsa raadamine, vana asfaltkatte freesimine, põlevkivituhaga stabiliseeritud kihi purustamine, kraavide puhastamine ja kaevamine, sobimatu pinnase kaeve, muldkeha ja liivaluse ehitamine, killustikaluste ehitamine, kompleksstabiliseeritud kihi ehitamine, asfalteerimine, peenarde kindlustamine, haljastamine ja liikluskorraldusvahendite paigaldamine. Ajakulu arvutuste järgi koostatud kalendergraafikus alustatakse töid objektil 15. aprill 2019 reeperite ja piketaažitikkude väljamärkimisega. Vastavalt lepingule peavad ehitustööd objektil lõpetatud olema 7 kuud hiljem alates alustamiskorraldusest. Kalendergraafikus välja toodud kuupäevade järgi ehitades on võimalik Tellija poolt esitatud vahetähtaegadest kinni pidada ja objekt valmib õigeaegselt. Lõputöö autor on omapoolseid kogemusi arvestades arvamusel, et objektil tuleb tööde teostamisel ettenägematuid seisakuid, millega pole graafikus arvestatud. Lähtuvalt sellest võivad osad tööd võtta kauem aega ja lõputöös koostatud kalendergraafikut tuleb täiendada pidevalt objekti ehitustööde vältel.

Abstract [en]

The construction management project for the reconstruction of km 0,290 – 11,295 on the basic road 90 Põlva – Karisilla that has been created as a thesis is of great assistance to the project team for planning and carrying out the construction work. The necessary resources and the timetable pointd out in the diploma paper enable already early enough to complete the requested machinery for different construction phases. In the thesis the biggest construction activities have been brought out, such as deforestation, milling the old asphalt surfacing, crushing of oil shale stabilised layer, cleaning and digging the ditches, removing the unsuitable surface, building the embankment and sand base course, construction of the crushed stone layer, building the complex stabilised layer, construction of asphalt concrete pavement; granular fill of shoulders, landscaping and installing the traffic control devices. According to the timetable compiled by the calculation of the consumption of time for the construction work, it starts on 15th April 2019 with downmarking definite inception points or control points of measurement. In accordance with the contract, the construction work should be finished 7 weeks after the commencement of work. Building in agreement with the dates in the timetable it is possible to meet the in-between deadlines given by the client and to finish the project on time. Taking into consideration personal experience, the author of the thesis is of the opinion that there might occur unexpected dead time that has not been taken into account in the timetable. Due to the fact some operations might take longer time than planned and the timetable should be constantly updated during the construction work.

Item Type: thesis
Advisor: Meelis Toome
Subjects: Construction > Road Construction > Road building > Road building work
Divisions: Institute of Construction > Road Construction
Depositing User: Erki Plato
Date Deposited: 31 May 2019 05:53
Last Modified: 05 Jun 2019 09:22
URI: http://eprints.tktk.ee/id/eprint/4536

Actions (login required)

View Item View Item