Rakvere Ametikooli õpilaskodu ehituse organiseerimine

Dubinin, Maksim (2019) Rakvere Ametikooli õpilaskodu ehituse organiseerimine. [thesis] [en] Construction organisation of Rakvere Vocational School Dormitory.

[img] PDF - Published Version
Restricted to Registered users only

Download (13MB)
[img] Other (retsensioon) - Other
Restricted to repository personnel only

Download (394kB)

Abstract

Käesolva lõputöö temaks on valitus Piiri tn 8, Rakvere Ametikooli õpilaskodu. Mahukaimatesks töödeks kujunesid lammutustööd, betoonitööd, montaažitööd, fassaaditööd, tehnosüsteemid ning hoone sisseviimistlus. Lõputöö koostajal oli ehituse organiseerimise projekti koostamiseks kasutada planeeritava hoone projekti arhitektuurne ja konstruktiivne osa põhiprojekti staadiumis. Ehitustööde läbiviimiseks on koostatud ehitusplatsi üldplaan. Ehitusplatsi plaanil on näidatud üldine olukord objektil, soojakute paiknemine, erinevate konteinerite asukohad, masinate liikumis- ja töötamisalad, laoplatside asukohad, ajutiste piirete ja parkimise ala ning trasside paiknemine ja liitumispunktid. Lõpputöö kägus koostas autor ehitustööde mahutabel, mille põhjal koostati detalne eelarve. Lõputöös on leitud ajutise vee ja elektrieneergia vajadus ning on koostatud koondkalendergraafik. Teoreetilise koguse arvutamisel kasutatakse Ratu Ajanormide käsiraamat 2008. Põhjalikumalt käsitles autor töös tüüpkorruse raudbetoonelementide montaažitööd ning viilkatuse ehitustehnoloogia. Mõlema osa kohta on koostatud seletuskiri ning graafiline tehnoloogiakaart. Lisaks on tehnoloogiakaardis detailsemalt kirjeldatud tööde kalendergraafikuid ning tööjõuvajadust. Ehitatava hoone töömahukuseks kujunes 211 päeva. Ehitustöödega alutatakse 10.29.2018 ning planeeritavaks lõpptähtajaks on 8.30.2019. Maksimaalselt on ehitusplatsil Märtsi - Aprilli kuus 39 töölist ja 5 peatöövõtja esindajat. Ehitustööde kogumaksumus kujunes 4258152 € + km. Organiseerimiskuludeks sai autor 280944 € + km, mis moodustab kogumaksumusest 6,6%.

Abstract [en]

Construction organisation of Rakvere Vocational School Dormitory. The aim of this thesis is to solve the organisation of construction of Vocational School Dormitory at Piiri 8, in the town of Rakvere. The dormitory is a new building put up in volume instead of the existing one. The building is designed considering functionality as a simple four-storey structure, with external dimensions 15 x 58 x 14,7 m. The new building is planned as a simple rectangular volume in the southwest corner of the property. The most extensive works include demolition, concrete, assembly, facade works, engineering systems and interior design. The author of the thesis could use for making the construction organisation project the architectural and constructive part of the planned building project in the main project stage. A general plan of the construction site has been prepared for the construction work. The construction site plan contains the general overview of the site, heating emplacement, location of different containers, machinery movement and working areas, location of the storage areas, the temporary fence and the parking area, as well as the location and connection points of the routes. In the thesis the author compiled a general table of construction works, on the basis of which a detailed budget was drawn up. The final thesis involves the need for temporary water and electricity supply, a composite calendar schedule has been prepared. The theoretical amount is calculated on the basis of Ratu Time Management Handbook 2008. In more detail, in his work the author discusses the installation of the prefabricated concrete elements and the construction technology of the gable roof. For both parts an explanatory note and a graphic process chart are provided. In addition, the process chart describes in detail the work schedule and the labour required. The volume of the building construction works makes up in total 211 days. The construction work started in October 29, 2018 and the preliminary deadline is August 30, 2019. There are maximum 39 workers and 5 supervisors on site in March - April. The total cost of the construction work is 4,258,152 € + VAT. The author calculated the organisational costs 280,944 € + VAT, which is 6.6% of total costs.

Item Type: thesis
Advisor: Jüri Tamm
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Institute of Construction > Building Construction
Depositing User: Maksim Dubinin
Date Deposited: 05 Jun 2019 07:03
Last Modified: 05 Jun 2019 07:03
URI: http://eprints.tktk.ee/id/eprint/4507