Ülemiste büroohoone ehitustööde organiseerimine

Kirss, Karmo (2019) Ülemiste büroohoone ehitustööde organiseerimine. [thesis] [en] Organising the Construction of Ülemiste office Building.

[img]
Preview
PDF - Published Version
Download (6MB) | Preview
[img] PDF (retsensioon) - Other
Restricted to repository personnel only

Download (373kB)

Abstract

Lõputöö eesmärgiks oli lahendada Ülemiste büroohoone ehituse organiseerimise projekt. Töös on kirjeldatud büroohoone arhitektuurset ja konstruktiivset lahendust. Lisaks on koostatud ehitatava büroohoone kohta detailne mahutabel ja eelarve. Hoone kogumaksumuseks on 13,4 miljonit eurot, millele lisandub käibemaks. Ehituse organiseerimiskulud moodustavad 6,9% büroohoone kogumaksumusest. Lõputöös lahendati Sepapaja tänav 1 ehitusobjekti üldplaan, kus on näidatud tornkraana positsioon ja tööraadius, ehitussoojakud ja materjalide laoplatsid, masinate liiklemine ning trasside paiknemine ja nende liitumispunktid. Lisaks on põhjendatud tõsteseadme valik, milleks on tornkraana Liebherr 280 EC-H. Vastavalt objekti ehitustööde kalendergraafikule on büroohoone ehituse kestus 18 kuud. Ehitustöid alustati 27. septembril 2018 ning lõpetatakse 27. märtsil 2020. Põhjalikumalt on käsitletud büroohoone katusetöid ja tüüpkorruse siseviimistlustöid. Mõlema töö kohta on eraldi koostatud seletuskiri ja graafiline tehnoloogiakaart, kus on detailsemalt kirjeldatud tööde tegemist. Lisaks on välja toodud tööde tegemiseks vastavad ohutusnõuded ning käsitletud on ka objektil üldiseid kehtivaid keskkonna- ja tuleohutusnõudeid. Organiseerimise projekt aitab ehitustöödel vältida tehnoloogilisi pause, välja tuues võimalikud puudused. See kõik on abiks, et objektil oleks ehitustöö algusest lõpuni pidev ja sujuv.

Abstract [en]

The aim of the thesis was to solve the project of organizing the construction work of Ülemiste office building. The thesis describes the architectural and constructive solution of the office building. In addition, a detailed volume chart and a budget have been prepared for the office building under construction. The total cost of the building is EUR 13.4 million plus VAT. Construction organization costs represent 6.9% of the total cost of the office building. The master plan of Sepapaja Street 1 was solved in the thesis, indicating the position and working radius of the tower crane, the heated shelters and storage areas for materials, the movement of machinery and the location of the routes and their connection points. In addition, the selection of the lifting device, Liebherr 280 EC-H tower crane, has been justified. According to the calendar schedule of construction works at the object, the duration of the construction of the office building is 18 months. Construction work commenced on September 27th, 2018 and will be finished on March 27, 2020. The roofing works of the office building and interior finishing works of a standard floor have been discussed in more detail. An explanatory memorandum and a graphic technology card, where the work is described in more detail, have been prepared separately for both works. In addition, the relevant safety requirements for carrying out the work have been specified and the general environmental and fire safety requirements of the site have also been discussed. The organization project helps to avoid technological breaks during the construction work, highlighting possible shortcomings. All of this helps to ensure that the construction work at the object is continuous and smooth from the beginning to the end.

Item Type: thesis
Advisor: Aivo Pedak
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Institute of Construction > Building Construction
Depositing User: Karmo Kirss
Date Deposited: 05 Jun 2019 07:50
Last Modified: 05 Jun 2019 07:50
URI: http://eprints.tktk.ee/id/eprint/4441