Tootmishoone ehituse organiseerimine

Tartu, Kristo (2019) Tootmishoone ehituse organiseerimine. [thesis] [en] Organisation Works of the Construction of Rauameister Production House.

[img] PDF - Published Version
Restricted to Registered users only

Download (3MB)
[img] Other (retsensioon) - Other
Restricted to repository personnel only

Download (27kB)

Abstract

Lõputöö eesmärk on lahendada uue tootmishoone ehituse organiseerimise projekt ja detailsemalt 0– tsüklitööde ning montaažitööde etapid. Töös on kirjeldatud hoone arhitektuuri ja on koostatud detailne ehituseelarve ning koondkalenderplaan. Tootmishoone asub Võru maakonnas, Väimela alevikus, Pärna tee 20b kinnistul. Lõputöö aluseks on võetud LOOB Projekt OÜ poolt koostatud arhitektuurne eelprojekt ja Gravity OÜ poolt konstruktiivne eelprojekt. Vastavalt koostatud eelarvele ja koondkalenderplaanile on ehitustööde algusajaks 15.04.2019 ning planeeritud lõpukuupäev 23.12.2019, mis teeb ehitustööde kestvuseks 180 päeva. Maksimaalne tööjõu vajadus ühel päeval on 25 töölist. Objektil kasutatavad tõstemasinad on 35 t autokraana, hüdrokraanaga madelauto, teleskooplaadur ning korv- ja käärtõstukid. Detailne ehituseelarve on koostatud lähtudes EKE NORA OÜ poolt välja töötatud ühikhindadest, kehtivatest hinnapakkumistest ja standardist EVS 885:2005. Ehitustööde kogumaksumuseks kujunes 1 825 414,44 eurot + käibemaks 20%. Ehituse organiseerimise kulud on kokku 173 049,92 eurot, mis moodustab kogu eelarvest 9,5% Lõputöö koostamise käigus omandas autor palju uusi teadmisi montaažitööde ja 0– tsüklitööde tehnoloogiliste protsesside kohta. Lisaks lahendati ära masinate liiklemine ja materjalide ladustamine ehitusplatsil, mis hõlbustab tööde tegemist.

Abstract [en]

Organisation Works of the Construction of Rauameister Production House The aim of this graduation thesis Organisation project of Rauameister production house is to give an overview of organising the construction. The organising project consists of the description of architectural and structural solution, a detailed budget, the general schedule, the general plan of construction and process charts for detail assembling and 0 – cycle works. The construction is located in south of Estonia in Võru parish in Väimela borough at Pärna Road 20b. The bases for this thesis are architectural and structural preliminary projects with a letter of explanation drafted by LOOB Projekt LLC and Gravity LLC. The architectural and structural description of this thesis describes the conceptual solutions for water, drainage, heating, ventilation and electrical systems. Architecturally the building is divided into four naves, three longways and one crosswise. At the end of the building there are rooms for technology. In the front of the building there is a household section with dressing room on the first floor and a small office on the second floor. The calculations for the detailed budget are based on time norms and work volume which are drafted by EKE NORA LLC. The total budget of this construction is 1 825 414,44 euros + 20% value added tax and the organisational cost is 173 049,92 euros, which is 9,5% of the entire budget. The general schedule is based on the detailed budget. The construction works are planned to start on 15th of April 2019 and the production house should be ready to be handed over to client by 23rd of December 2019, which makes the duration of construction 180 workdays. The maximum workforce for one day is 25 workers. Writing this graduation thesis gave the author new knowledge of organising earthworks, pile works and assemblage.

Item Type: thesis
Advisor: Andres Kaur
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Institute of Construction > Building Construction