Peetri tn 5 ehitustööde organiseerimine

Maalinn, Igor (2018) Peetri tn 5 ehitustööde organiseerimine. [thesis] [en] Organisation of the Construction Works Performed at Peetri tn 5.

[img] PDF - Published Version
Restricted to Registered users only

Download (3MB)
[img] Other (lihtlitsents - bdoc) - Other
Restricted to Registered users only

Download (525kB)
[img] Other (retsensioon) - Other
Restricted to repository personnel only

Download (23kB)

Abstract

Antud lõputöö eesmärgiks oli lahendada Peetri tn 5 ehituse organiseerimine. Töö koostamisel on kasutatud erinevate autorite teoseid. Ehituse organiseerimise põhimahu kirjeldamisel kasutati Eensalu ja Pihel OÜ muinsuskaitse eritingimusi, Apex arhitektuurigüroo OÜ „Noblessneri laevatsehh, ümberehitamine ja laiendamine“ põhiprojekti ja Ekspertiis ja projekt OÜ uuringuid ning konstruktiivseid tööprojekte. Täpsemad tehnoloogiakaardid on koostatud esimese korruse betoon aluspõrandatele ja rullmaterjalist katuse ehitusele. Tehnoloogiakaartidele on koostatud kalendergraafikud, seletuskirjad ja toetavad joonised. Rekonstrueeritava hoone eelarveline maksumus on 2 279 562 eurot. Samuti on välja toodud ehituse organiseerimise maksumus, mis on 116797 eurot ja see moodustab ehituse kogumaksumusest 5%. Kirjeldatud summadele lisandub käibemaks 20%. Kalendergraafiku koostamiseks on kasutatud 1Partner Ehitus OÜ välja kujunenud ajanorme. Ajalise kestvuse eesmärk oli jõuda töödega valmis kaheksa – üheksa kuuga ja see eesmärk sai täidetud.

Abstract [en]

The purpose of this thesis was to solve the organisation of the construction at Peetri tn 5. Works of various authors have been used in this thesis. Upon describing the main volume of the organisation of the construction, the special conditions of heritage conservation of Eensalu ja Pihel OÜ, the main project “Noblessner ship factory, reconstruction and extension” of Apex Arhitektuuribüroo OÜ, the studies of Ekspertiis ja Projekt OÜ as well as constructive work projects were used. Detailed technological charts have been prepared for the concrete flooring of the first floor and for the construction of the roof made of roll covering. Calendar schedules and explanatory reports have been prepared for the technological charts. The value of the budget of the reconstructed building is EUR 2,279,562. Also, the cost of the organisation of the construction has been mentioned; it is EUR 116,797 and it is 5% of the total cost of the construction. Value added tax of 20% is added to the described sums. The developed time standards of 1Parner Ehitus OÜ are used for preparing the calendar schedule. The purpose of the duration was to complete the works in 8–9 months and this purpose was achieved.

Item Type: thesis
Advisor: Anneli Ramjalg
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Institute of Construction > Building Construction
Depositing User: Igor Maalinn
Date Deposited: 08 Jun 2018 11:37
Last Modified: 08 Jun 2018 11:37
URI: http://eprints.tktk.ee/id/eprint/3693