Metall-ja profiiluste komplekteerimistsehhi moderniseerimine

Mangelsoo, Kristo (2018) Metall-ja profiiluste komplekteerimistsehhi moderniseerimine. [thesis] [en] The modernization of the assembly line for the metal and profile doors.

[img] PDF - Published Version
Restricted to repository personnel only until 1 January 2028.

Download (1MB)
[img] Archive (ZIP) - Supplemental Material
Restricted to repository personnel only until 1 January 2028.

Download (343kB)
[img] PDF (lihtlitsents) - Other
Restricted to repository personnel only until 1 January 2028.

Download (139kB)

Abstract

Käesoleva lõputöö teemaks oli metall- ja profiiluste komplekteerimistsehhi moderniseerimine, mille teostasin ettevõttes AS Saku Metall Uksetehases. Komplekteerimistsehhi analüüsimise käigus sai leitud sobivamad seadmed ja koostatud tehnoloogiliste voogude skeem. Raskete toodete tõstmisel kasutatakse telfrit ja klaasi tõstmisel abivahendiks vaakumtõsteseadet. Mittevastavus ja ootel ustele sai leitud kindlad kohad. Kogu muudatus mahub olemas olevale pinnale. Töölisi on vaja täiendavalt 2, mis koos lisatud seadmetega teeb komplekteerimise efektiivsemaks. Seadmetena sai valitud pakkimismasin, telfer, käärlaud, vaakumtõsteseade, rull-lauad, pöörd-,kald-,tõstlaud mille tulemusena muutus ka tsehhi plaan. Tehnoloogiliste uuenduste kaasajastamise tulemuseks on uueks komplekteerimis ajaks kahepoolsel välisprofiiluksel 116,5 minutit, mis on 14 minutit lühem võrreldes eelmise komplekteerimise tööajast. Töötasu komplekteerimisel tuli 14 €, mis on 1,7 € vähem kui ennem ning mis tegi omahinna natuke väiksemaks. Aastaseks prognoosiks on võetud 2000 profiilust. Standard tuletõkke EI60 metallukse komplekteerimis ajaks on 30,31 minutit, mis on 12,51 min. lühem võrreldes eelmise komplekteerimise tööajast. Töötasuks komplekteerimisel tuli 3,6 €, mis on 1,45 € vähem kui ennem ning mis tegi samuti omahinna väiksemaks. Aastaseks prognoosiks on võetud 8700 metallust kuna tootmise efektiivsus kasvas Komplekteerimistsehhi moderniseerimise osana juurutatakse ka töökoha kordaseadmise meetodit 5S efektiivsuse tõstmiseks. Komplekteerimis tööaja kokkuhoiu arvelt arvestades aastaprogrammi väheneb uste omahind jaoskonnas ja töökulude kokkuhoid profiilustel 3400 EURi ja metallustel 12615 EURi. Lõputöös püstitatud eesmärgid said täidetud ja antud projekt läheb reaalselt kasutusse. Antud lõputöö tulemusel suureneb metalluste tootmise efektiivsus ja paraneb ettevõtte konkurentsivõime.

Abstract [en]

The subject of the present thesis is the modernization of the assembly line for the metal and profile doors, which I carried out at the company AS Saku Metall Uksetehas. In the process of the assembly workstation analysis was found suitable equipment’s with compiled technological workflow schemes. Non-conformance and pending doors have found certain places. For lifting heavy products and materials, telfer and vacuum lifting is used. The entire change will fit in the existing assembly space. Additional 2 workers are needed, which together with the added equipment makes the assembly more efficient. Equipment was selected such as wrapping machine, telfer crane, vacuum lifting device, roller tables, tilt-, pivot- and lifting table, scissor lift table which also shown in assembly workstation plan. In the result of the modernization of technological processes, the new assembly time for the double sided exterior door is 116,50 minutes, which is 14 minutes shorter than previously. New assembly cost is 14,00 EUR, which is 1,70 EUR less than before, which reduced the whole production cost. The yearly estimation is 2000 profile doors. Assembly time for the standard fire barrier EI60 metal is 30,31 minutes, which is 12,51 minutes shorter than previous time. The new assembly cost is 3,60 EUR, which is 1,45 EUR less than before which reduced the production cost also. Due to the increase of the production efficiency the yearly estimation is raised up to 8700 metal doors. As part of the modernization of the assembly workstation, 5S methodology will be introduced to increase efficiency. Due to the reduction in assembly working times, the annual program reduces the cost of doors in the department and the cost savings on profile doors of 3400 EUR and metal doors 12615 EUR. The objectives defined in this thesis have been achieved and will be taken into use. As a result of this graduation work the efficiency of metal doors will increase and company’s competitiveness will improve.

Item Type: thesis
Advisor: Juhan Tuppits
Subjects: Mechanical Engineering > Production Engineering and Technology
Divisions: Institute of Engineering > Machine Building
Depositing User: Kristo Mangelsoo
Date Deposited: 08 Jun 2018 06:53
Last Modified: 08 Jun 2018 06:53
URI: http://eprints.tktk.ee/id/eprint/3625

Actions (login required)

View Item View Item