TTK Links: Home Page | TTK Moodle | ÕIS
TTK/UAS Repository For Digital Teaching and Learning Resources

Pneumaatilise manipulaatori projekteerimine

Suuster, Oliver (2017) Pneumaatilise manipulaatori projekteerimine. [thesis] [en] Design of Sprue picker.

[img]
Preview
PDF - Published Version
Download (1MB) | Preview
[img]
Preview
PDF (lihtlitsents) - Other
Download (31kB) | Preview

Abstract

Lõputöö eesmärk oli projekteerida pneumaatiline manipulaator, mis optimeeriks plastsurvevalu tootmist, eemaldades lisaaja, mis kulub valukanali eemaldamiseks. Lisaaeg tekkis, kuna eelneva manipulaatori pneumaatilised liikumised võtsid rohkem aega, kui detailide eemaldus vormist. Kirjeldatud ja analüüsitud on plastivalu protsessi ettevõttes Norma AS ning toodud välja tootmiseks kuluvad ajad, kus oli võimalik efektiivsust tõsta. Pneumaatiline manipulaator on projekteeritud töötama vormidega, mille tsükliaeg on 10 sekundit või vähem ning vormi kinnitusplaat on mõõtudega kuni 600 mm x 600 mm. Võimaldab töötada koos ja ilma euromapita. Vabalt programeeritav Siemens LOGO! kontroller võimaldab kohandada manipulaatorit erinevate generatsiooni survevaluseadmega. Kirjeldatud on pneumaatikat, laagreid, materjali ja elektriliste komponentide valikut. Majanduslikus osas on kirjeldatud seadme projekteerimisega ning koostamisega tulenevaid kulusid. Samuti on välja arvutatud teoreetiline tasuvusaeg. Majandusliku osa teises pooles on toodud välja sarnased turul pakutavad tooted koos valukanali eemalduse aja ning hinnaga. Selgus, et projekteeritaval manipulaatoril on kiirem tsükliaeg väiksema kulu eest ettevõttele. Manipulaatori projekteerimisel selgus, et on võimalik täita püstitatud eesmärk ning vähendada detaili (sele 1) tootmisaega 14.6% võrra.

Abstract [en]

The purpose of this thesis was to describe projection of pneumatic sprue picker and use it to optimize injection moulding manufacturing at Norma AS. Optimization was achieved by removal of extra time that previous sprue picker was causing. New sprue picker was designed to remove sprue within the time of the ejector cycle. Sprue picker was designed to work with mould which produces washers with weight of 2 grams and therefore faster cycle time was needed in order to be cost effective. It is also possible to use device with other similar moulds which have cycle time less than 10 seconds and mould dimensions don’t exceed width and length of 600 mm. Euromap is not needed but does support both EM12 and EM67 if needed, thanks to freely programmable SIEMENS LOGO! PLC controller. Economical calculations showed all the costs which comes with projection of sprue picker, also theoretical payback period is described. Other similar products with competitive cycle times and prices are compared in market research. Designed sprue picker has lower cost and faster cycle time than other products which are available for purchase. At the end of economical part it has proven that it is possible to manufacture 14,6% more effectively and sprue picker will earn back its cost in 32 weeks.

Item Type: thesis
Advisor: Samo Saarts
Subjects: Mechanical Engineering > Production Development > Designing of Pneumatic Systems
Divisions: Institute of Engineering > Machine Building
Depositing User: Oliver Suuster
Date Deposited: 12 Jun 2017 10:10
Last Modified: 12 Jun 2017 10:10
URI: http://eprints.tktk.ee/id/eprint/3013

Actions (login required)

View Item View Item