Pöörise tänav 6 parkimismaja ehituse organiseerimine

Sikka, Martti (2017) Pöörise tänav 6 parkimismaja ehituse organiseerimine. [thesis] [en] Organisation of Construction of Parking Building at Pöörise Street 6.

[img] PDF - Published Version
Restricted to Registered users only

Download (4MB)
[img] Other (lihtlitsents - bdoc) - Other
Restricted to Registered users only

Download (76kB)
[img] Other (retsensioon - bdoc) - Other
Restricted to repository personnel only

Download (23kB)

Abstract

Käesoleva lõputöö "Parkimismaja ehitustööde organiseerimine" eesmärk on lahendada aadressil Pöörise tn 6 asuva parkimismaja ehitustööde organiseerimine. Pöörise tn 6 parkimismaja projekti on koostanud Nord Projekt. Lõputöös on välja toodud ehituse organiseerimise maksumuse protsent kogu hoone maksumusest. Mahtude ja maksumuse leidmisel on kasutatud EKE NORA andmebaasi, lisaks on kasutatud konsultandi nõuandeid. Mahutabelit koostades on kasutatud EVS 885:2005 vormi. Antud hoone maksumuseks kujunes 3406351 eurot mis teeb ühe netopinna ehituse hinnaks 238 eurot. Lõputöös on koostatud üldine kalendergraafik ning montaaži- ja katusetööde kalendergraafik. Kalendergraafiku koostamisel on arvesse võetud erinevate tööde tehnoloogiaid ning tööjõu vajadust töö teostamisel. Erinevate ehitustööde brigaadid on komplekteeritud vastavalt tehnoloogilisi vajadusi silmas pidades. Ehitustööde pikkuseks kujunes 286 päeva. Töödega tehti algust 20.06.2016. Lõputöö koostamise käigus on autor koostanud ehitusplatsi üldplaani. Üldplaanil on näidatud ehitusplatsi suurus, masinate-ja soojakute paiknemine ehitusplatsil. Ehitusplatsi plaani koostades võttis autor arvesse maa-ala suurust ja objekti iseärasusi. Ühtlasi on lõputöös välja arvutatud objekti ajutise elektrienergia vajadus ja vajaliku veevarustuse võimekus. Antud töös on välja toodud ülevaade konstruktsioonidest ja tehnosüsteemidest. Lõputööd koostamine ja erinevate tehnoloogiate uurimine andis autorile juurde teadmisi montaaživaldkonnast. Oluline, et erinevate tööde tegemisel peetakse kinni ohutusnõuetest.

Abstract [en]

Organisation of Construction of Parking Building at Pöörise Street 6. The project of the parking building of Pöörise Street 6 has been prepared by AS Nord Projekt. The 6-storey parking building is designed in a future residential area which is located in the Mustamäe residential district near the border of Õismäe. The parking building is located in a housing development of Pöörise Street. In addition to the parking building, three 12-storey apartment buildings, seven 14-storey apartment buildings and a kindergarten up to 2 storeys will be built in the housing development. The building has six above-ground storeys for parking cars and, in addition, separate spaces for car wash. The dimensions of the building are 65.8 m * 40.3 m. The parking house is designed as a carcass building. The foundation of the building is cast-in-situ foundation of reinforced concrete. The panels that are supported on concrete beams are used as floor panels. The roof of the building is also the last parking storey. The rigidity of the parking building is ensured by precast reinforced concrete walls in the centre of the building. Staircases also ensure rigidity. A general calendar schedule as well as erection and roofing works calendar schedule have been prepared in the final paper. Upon preparation of calendar schedule, technologies of various works and necessity of work force in conducting the works have been taken into account. The crews of various construction works are put together, considering the technological needs. The duration of the construction works is 286 days. The construction works were started on 20 June 2016. In the course of writing the final paper, the author has prepared a key plan of the construction site. The size of the construction site and the location of the machines and the barracks at the site are shown on the key plan. Upon preparation of the plan of the construction site, the author took the size of the area and the characteristics of the object into account. Furthermore, the necessity of temporary electricity of the object and the capacity of the necessary water supply have been calculated in the final paper. This final paper gives an overview of the construction and utility systems.

Item Type: thesis
Advisor: Aivars Alt
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Faculty of Construction (until 2017) > Building Construction
Depositing User: Martti Sikka
Date Deposited: 08 Jun 2017 11:21
Last Modified: 08 Jun 2017 11:21
URI: http://eprints.tktk.ee/id/eprint/2890

Actions (login required)

View Item View Item