Laohoone ehitustööde organiseerimine

Krikk, Arlis (2017) Laohoone ehitustööde organiseerimine. [thesis] [en] Organization of Construction Works of a Warehouse.

[img]
Preview
PDF - Published Version
Download (5MB) | Preview
[img] Other (lihtlitsents - bdoc) - Other
Download (76kB)
[img] Other (retsensioon - bdoc) - Other
Restricted to repository personnel only

Download (30kB)

Abstract

Käesoleva lõputöö teemaks on valitud laohoone ehituse organiseerimise projekt. Lõputöö objektiks on Papiaru 14, Rakvere linna planeeritud kergkonstruktsioonist laohoone. Projekteeritud laohoone asub Rakvere linna piiril põhjapoolses osas. Lõputöö koostajal oli ehituse organiseerimise projekti koostamiseks kasutada planeeritava hoone projekti arhitektuurne ja konstruktiivne osa põhiprojekti staadiumis. Vastavalt koostatud põhiprojektile on lõputöös kirjeldatud põhjalikult hoone arhitektuurset üldkontseptsiooni, konstruktiivset lahendust ja ehitusel kasutatud materjale. Üldiselt on kirjeldatud hoonesse ette nähtud kütte-, ventilatsiooni-, kanalisatsiooni-, vee- ja elektrisüsteemide lahendusi. Töös on koostatud hoonele detailne ehituseelarve, mille ühikhinnad on saadud EKE NORA normbaasist. Laohoone ehitusmaksumuseks on saadud 291 990,16 €, mis teeb m2 maksumuseks 760 €. Ehituse maksumusest moodustavad ehitusplatsi korralduskulud 19 599,6 € ehk 6,7%. Ehitusplatsi üldkuludena on kalkulatsiooni tulemusena saadud 20 034 €, mis teeb kogusummast 6,9%. Lõputöö projektiga on koostaja lahendanud objekti korralduse põhimõttelise lahenduse ja koostanud ehitusplatsi plaani. Projekti koostamise tulemusena on leitud objekti eeldatav valmimise aeg. Ehitustegevuse alguseks on 05.06.2017 ning lõpukuupäevaks on 27.09.2017, mis annab ehituse pikkuseks 82 päeva. Ehitustegevuse tippajal on objektile ette nähtud töötajate arv 16. Objektil kasutatakse kraanat, madelautot ja väiksemaid korvtõstukeid. Põhjalikumalt on töös analüüsitud õõnespaneelide ja fermide montaažitöid ja katuse paigaldustöid, mille jaoks on koostatud täpsed tehnoloogiakaardid. Tehnoloogiakaartide koostamise tulemusena on ära määratud kraana vajadus ja tõstesektor. Samuti kajastab kaart teostavate tööde tehnoloogiat, vajalikke töövahendeid ja ohutusnõudeid. 59 Koostatud organiseerimise projekt annab hea ülevaate ehitustegevusest tervikuna ning toob välja puudused ja ohud, mis võivad saada takistuseks hoone püstitamisel.

Abstract [en]

The subject of this final paper is a project for organising the construction works of a warehouse. The object of the final paper is a light-structure warehouse planned at Papiaru 14, Rakvere. The designed warehouse is located at the northern boundary of the town. Upon preparing the project for organising the construction works, the author of the final paper had access to the architectural and constructional part of the final design. Based on the final design, the general architectural concept, constructional solution and materials used in the building have been described in detail in the final paper. The planned solutions of heating, ventilation, sewerage, water and power systems in the building have been described in general terms. In the paper, a detailed construction budget has been drawn up for the building with unit prices taken from the EKE NORA standard base. The calculated construction cost of the warehouse is € 291 990,16 €, and thus the cost of one m2 € 760. The building site management costs amount to € 19 599,6 € or 6.7 per cent of the construction cost. The calculated overhead costs are 20 034 €, which amount to 6.9 per cent of the total cost. With the project in the final paper, the author has provided a principal solution of the object management and drawn up a plan of the building site. Within the project, the expected completion time of the building has been calculated. The construction works start on 5 June 2017 and the planned completion date is 27 September 2017, so the duration of construction is approximately 82 days. During the peak of the construction works, the planned number of employees on the site is 16. A crane, vehicle lift and smaller cage lifts are used on the site. The assembly of hollow-core slabs and trusses and roof installation have been analysed in more detail in the paper. For those works, detailed process charts have been prepared. As a result of 61 making the process charts, the crane need and lifting sector have been determined. The charts also include the technology of the works to be carried out, necessary tools and safety requirements. The prepared organisation project provides a good overview of the construction as a whole and identifies weaknesses and threats that may hinder the erection of the building.

Item Type: thesis
Advisor: Anneli Ramjalg
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Institute of Construction > Building Construction
Depositing User: Arlis Krikk
Date Deposited: 08 Jun 2017 10:59
Last Modified: 08 Jun 2017 10:59
URI: http://eprints.tktk.ee/id/eprint/2798