Riigimaantee nr 89 Põlva - Saverna km 0,0-9,0 põhitee ehituskorralduse projekt

Paur, Kalvar (2016) Riigimaantee nr 89 Põlva - Saverna km 0,0-9,0 põhitee ehituskorralduse projekt. [thesis] [en] Construction Management Project for Main Road nr 89 Põlva-Saverna Kilometers 0,0-9,00.

[img]
Preview
PDF - Published Version
Download (2MB) | Preview
[img]
Preview
PDF - Supplemental Material
Download (2MB) | Preview
[img]
Preview
PDF (lihtlitsents) - Supplemental Material
Download (1MB) | Preview

Abstract

Lõputööna valminud riigimaantee nr 89 Põlva- Saverna km 0,0-9,0 ehitustööde korralduse projekti järgselt on võimalik töid objektil teostada läbimõeldult ning on projekti juhtimise protsessis töid teostavale meeskonnale suureks abiks. Töös käsitletud tööde teostamise tehnoloogiad ja ajalise kulu arvutused on töö autori isiklik nägemus ning põhineb suuresti isiklikel kogemustel teedeehituse valdkonnas. Lõputöös on käsitletud kõikide põhiliste tööde teostamist- metsa raadamist, olemasoleva katendi freesimist, kraavide kaevamist, truupide ehitust, kasvupinnase koorimist, nii sobiva kui sobimatu pinnase kaevandamist, vana muldkeha laiendamist, muldkeha ning bituumenstabiliseeritud aluse ehitamist, asfaltbetoonist katte ehitust, haljastamist ja uute liikluskorraldusvahendite paigaldamist. Lõputöö ühe osana programmis MS Project koostatud kalendergraafiku järgselt alustatakse töid objektil 9. mail 2016, piketaažitikkude väljamärkimisega ning tööde lõpetamise tähtaeg on 18. novembril 2016, kui peaks valmima lõplik teostusjoonis tehtud tööde kohta. Kalendergraafiku järgselt saab objekt Tellijale üle antud tähtaegselt ning vahetähtaegadest kinni pidades. Lõputöö autor on veendunud, et kõik ei laabu objektil kindlasti ajagraafiku järgselt ning muudatuste tegemine aegajalt on vältimatu, küll aga annab lõputöö ühe osana koostatud kalendergraafik hea indikatsiooni võrdluseks objekti tähtaegse valmimise suhtes.

Abstract [en]

This thesis has been composed as a construction management project for Estonias main road nr 89, Põlva-Saverna kilometers between 0,0-9,0. This project has been made in 2013 by Reaalprojekt OÜ by the order of Southern Region of Estonian Road Administration. The main purpose of this reconstruction is to improve traffic safety and overall driving conditions. First part of this thesis contains descriptions of all the main works done on site– clearing of land, milling old asphalt, building culvert pipes, digging ditches, removing soil and non-filtrating materials from old road bed, expanding the width of the road, building embankments and stabilising base course with bitumen, laying asphalt, landscaping and placing new traffic signs. Second part is about calculations of time and resources to get work done, which are based mainly on the authors years of working experience in the field of road construction in Estonia. As a result of those calculations, timetable and a resource graph has been composed in MS project, a project management program, which ensures that it being followed, the project will be finished and handed over to the Estonian Road Administation before deadline. The author of this thesis is certain, that timetable can not be followed at all times and deviations definitely will take place on site. Nevertheless this schedule still gives a good indication if the project will be finished in deadline or not and is a great help for project management on site.

Item Type: thesis
Advisor: Alan Muruväli
Subjects: Construction > Road Construction > Road building > Road building work
Divisions: Institute of Construction > Road Construction
Depositing User: Kalvar Paur
Date Deposited: 10 Jun 2016 08:50
Last Modified: 10 Jun 2016 08:50
URI: http://eprints.tktk.ee/id/eprint/2384