Korterelamu ehitustööde organiseerimine

Tohvri, Piret (2016) Korterelamu ehitustööde organiseerimine. [thesis] [en] Organising the Construction of the Apartment.

[img]
Preview
PDF - Published Version
Download (10MB) | Preview
[img]
Preview
PDF (lihtlitsents) - Supplemental Material
Download (432kB) | Preview
[img] Other (retsensioon) - Supplemental Material
Download (14kB)

Abstract

Lõputöö peamiseks eesmärgiks oli organiseerida Pikaliiva 92 ehitatava korterelamu ehitustöid. Ehitatav hoone on neljakorruseline kortermaja, mis asub Tallinnas Haabersti linnaosas. Korterelamus asetseb kolmel korrusel 12 korterit, esimesel korrusel tehnoruumid ja panipaigad. Lõputöös on kasutatud arhitektuurset projekti, mille on koostanud Arhitektuuribüroo AB Lokomitiiv, konstruktiivset projekti ning erisosade projekti, mille on koostanud Projekt O2. Lõputöö koosseisu kuulub lisaks seletuskirjale eelarve, ehitustööde üldine kalendergraafik, asendiplaan ja kaks tehnoloogiakaarti, milles autor on lahendanud fassaaditööde- ja siseviimistlustööde organiseerimise. Eelarve koostamisel on ühikhindade leidmisel kasutatud EKE Norat ning Astlanda Ehituse OÜ poolt koostatud eelarvet. Hoone kogumaksumuseks on 845 532,6 € . Eraldi peatükina on autor toonud välja kulud ehituse organiseerimiseks mis on 12,1 % kogusummast. Hoone üldkalendergraafiku alusel kestab ehitus 232,7 päeva. Hoone asendiplaanil on näidatud ehitusplatsi plaan, mis koosneb Pikaliiva 92 ja Rõugu 2 krundist, kuna hooned ehitatakse ühes järgus, siis ei saa autor käsitleda Pikaliiva 92 objekti teistest täiesti eraldatult. Plaanil on näidatud ajutine aed, soojakud, materjalide ladustamise ala, esmaabi vahendite asukoht, üldine valgustus ning kuivkäimlad. Töös on käsitletud üldiseid tööohutusnõudeid, fassaaditööde ning viimistlustööde tööohutusnõudeid ning kvaliteedikontrolli teostamise põhimõtteid. Lisaks on töös välja toodud üks näide kliendi muudatuste juhtimine/sisseviimisest?, mille baasil seletab autor, kuidas konkreetset muudatust läbi viidi, millised olid lahendused ning kuidas oleks võinud antud muudatust ette näha.

Abstract [en]

The aim of this thesis was to organise the construction work on the apartment building at 92 Pikaliiva Street in Haabersti, Tallinn. The building under construction is a four-storey apartment block. It has technical and storage rooms on the ground floor and in total 12 apartments. The architectural design by AB Lokomotiiv architects and the structural and utility system design by architectural and structural design bureau Projekt O2 were used in the thesis. This thesis includes an explanatory note, a budget, a general construction schedule, a site layout and two process charts in which the author sets out the organisation of interior and exterior work. The construction cost estimating company EKE Nora and the budget drafted by the construction and project management company Astlanda Ehitus were used to determine unit prices when establishing the budget. The total cost of the building is 845 532,6 € . In a separate chapter, the author highlights the cost of organising the construction, which amounted to 12,1 % of the total sum. According to the general construction schedule, construction work will last for 232,7 days. The site layout presents the construction site plan, which includes the plots at 92 Pikaliiva Street and 2 Rõugu Street. Since the buildings are being constructed at the same time, the author cannot consider the 92 Pikaliiva Street building separately. The plan includes a temporary fence, modular offices, a materials storage area, the location of a first aid kit, general lighting and portable toilets. This thesis also considers general occupational safety requirements, safety requirements of exterior and finishing work and principles of carrying out quality control. In addition, the thesis highlights the management of the client's revisions on the basis of an example, author explains how the individual revisions were carried out, what the solutions were and how the given revision could have been foreseen.

Item Type: thesis
Advisor: Anneli Ramjalg
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Institute of Construction > Building Construction
Depositing User: Piret Tohvri
Date Deposited: 13 Jun 2016 10:25
Last Modified: 13 Jun 2016 10:25
URI: http://eprints.tktk.ee/id/eprint/2151