Vana-Kuuli 15-3/ Liikuri 41-3 ehitustööde organiseerimine

Kens, Cristo (2015) Vana-Kuuli 15-3/ Liikuri 41-3 ehitustööde organiseerimine. [thesis] [en] A Construction Management Plan for an Apartment Building at Vana-Kuuli 15-3, Liikuri 41-3, Tallinn.

[img]
Preview
PDF - Published Version
Download (1MB) | Preview
[img] Archive (ZIP) - Supplemental Material
Download (3MB)
[img] Microsoft Word (lihtlitsents) - Supplemental Material
Download (75kB)
[img]
Preview
PDF (retsentsioon) - Supplemental Material
Download (354kB) | Preview

Abstract

Käesoleva lõputöö eesmärgiks oli lahendada Liikuri tänav 41 ja Vana-Kuuli tänav 15 nurgal olev korterelamu ehituse organiseerimine. Lõputöö lahendamise alusprojektiks oli arhitektuurne ja konstruktiivne projekt. Töö autor on lõputöös kasutanud tööde normeerimiseks ning eelarvestamiseks EKE NORA-t ja konsultandi kogemustel põhinevaid ajanorme ja ühikhindasi. Lõputöös koostati ehitustööde mahutabel, mille alusel moodustati hoone kogumaksumus. Hoone kogumaksumuseks saadi 2 324 890 € + käibemaks. Samuti määrati mahtude ja ajanormide baasil korterelamu ehitamisele kuluv aeg, koostati koondkalendergraafik. Tööde kestuseks saadi 368 päeva ehk korterelamu ehitamiseks kulub 1 aasta. Koondkalendergraafiku koostamisel on töö autor lähtunud erinevate tööliikide tehnoloogilistest järjekordadest ning jälginud täpselt neid töid, mis nõuavad tehnoloogilisi pause. Näiteks monolitiseerimised toimuvad töönädala lõpus, et betoon saavutaks järgmise töönädala alguses piisava tugevuse. Betooni tugevuse kiiremaks saavutamiseks on kasutatud küttekaableid. Kalendergraafiku põhjal maksimaalne tööliste arv objektil on 45 inimest, nendele lisanduvad objekti meeskonna liikmed. Lõputöös on valitud tõstemehhanismiks tornkraana. Tornkraana maksumus tuli arvutuslikult väiksem, kui autokraanal ning tornkraanaga on monteerimist võimalik kiiremini teostada. Lisaks koostas töö autor kaks detailsemat tehnoloogiakaarti. Tehnoloogia kaart vahelae montaaži kohta ning garaaži katuslae ehituse kohta. Ehitusplatsi üldplaanil tõi autor välja hoone paiknemise krundil, tõstemehhanismi paiknemise, olulisemad liiklemisteed ja suunad, ehituslinnaku, töötsoonid ja ohualad ning ajutised kommunikatsioonid. Kasutatavate tõstemehhanismide ja masinate vajadustele koostas töö autor ehituse organiseerimiseks vajaliku kulude kalkulatsiooni. Ehituse organiseerimisekuludeks on 147 941 € + käibemaks, mis moodustab hoone eelarvelisest maksumusest 6,4%. Lõputöös on olulist tähelepanud pööratud tööohutusele, mis on põhjalikumalt välja toodud ka tehnoloogiakaartide peatükkides. Töövõtu meetodiks on töö autor valinud peatöövõtu.

Abstract [en]

The subject of this thesis is construction management of an apartment building at Liikuri tänav 41-3/ Vana-Kuuli 15-3. As a reference, the author of the thesis has used the work design of the structural part, construction design of the architectural part, main design of the heating and ventilation system, main design of the water supply and sewerage system and work design of electrical installations. The objective of the thesis was to prepare a construction management plan for the apartment building and various stages related to it. Within the frame of the work a combined time schedule of the building was prepared, the total cost of the building and total cost of construction management was calculated, machines and lifting equipment needed to perform work were selected and operation methods were described. For standardising work and preparing estimations, the author used EKE NORA and timelines and unit prices based on the experience of the consultant in the thesis. Within the thesis a construction work volume table was prepared, on the basis of which the total cost of the building was calculated. As a result the total cost of the building was calculated to be € 2,324,890 + VAT. Based on the volumes and timelines construction time of the apartment building was determined and a combined time schedule prepared. As a result it was determined that the duration of work is 368 days, or in other words it takes 1 year to build the apartment building. Based on the time schedule it was determined that the maximum number of workers required at the construction site is 45 people, plus the team members of the site. In the thesis a tower crane was selected as the lifting mechanism. The cost of a tower crane is less than the cost of a truck crane and the assembly work takes less time when a tower crane is used. In addition, the author of the thesis prepared two more detailed technology maps. A technology map 60 for the assembly of the floor and constructing the roof ceiling of the garage was prepared. In the general plan of the construction site the author marked the location of the building on the plot, location of the lifting mechanism, major traffic roads and directions, a construction village, work zones and danger areas and temporary communication lines. Regarding lifting mechanisms and machines, the author of the thesis prepared a cost calculation necessary for construction management. The construction management costs are € 147,941 + VAT, which form 6.4% of the budget cost of the building.

Item Type: thesis
Advisor: Aivars Alt
Subjects: Construction > Building Construction > Construction > Organization of construction
Divisions: Institute of Construction > Building Construction
Depositing User: Cristo Kens
Date Deposited: 10 Jun 2015 08:25
Last Modified: 10 Jun 2015 08:25
URI: http://eprints.tktk.ee/id/eprint/1275

Actions (login required)

View Item View Item