TTK Links: Home Page | TTK Moodle | ÕIS
TTK/UAS Repository For Digital Teaching and Learning Resources

Ventilatsiooni seadmete tootmisjaoskonna planeerimine

Varind, Lauri (2015) Ventilatsiooni seadmete tootmisjaoskonna planeerimine. [thesis] [en] Production line planning for ventilation equipment components.

[img]
Preview
PDF - Published Version
Download (2MB) | Preview
[img]
Preview
PDF (lihtlitsents) - Supplemental Material
Download (276kB) | Preview

Abstract

Käesoleva lõputöö teemaks oli ventilatsiooni kanalite tootmisjaoskonna kaasajastamine , mille käigus on valitud uued seadmed ja koostatud uus tehnoloogiliste voogude skeem. Vastavalt tehnoloogiliste voogude skeemile on leitud sobivaim paigutus uutele tööpinkidele olemasolevas tootmishoones. Tootmisjaoskonna plaanil on tööpingid paigutatud selliselt, et toorikute liikumisteed oleksid võimalikult lühikesed ja tootmisprotsess sujuv. Arvestatud on ka võimalusega tootmismahtu tulevikus suurendada. Antud lõputöös on töötatud välja ka vajalikud abivahendid efektiivsuse tõstmiseks ja soovitud tulemuse saavutamiseks. Tuginurkade tootmistehnoloogia muutmisega lühenes nende valmistamise aeg 5 korda, mis on hea tulemus. Tööliste arvu vähendamiseks on välja töötatud rakis koostamisliinile, mille tulemusel on toodete koostamisel vaja 4 töölise asemel 2. Tehnoloogiliste protsesside kaasajastamise tulemusel saavutati uueks ühe toote tükiajaks 34 min, mis on 27% lühem võrreldes olemasoleva tootmisprotsessiga saavutatud ajast. Selline võit tükiajas on piisav, et saavutada konkurentsivõimeline omahind. Toote uueks omahinnaks kujunes 56,28 EUR ja seega langes omahind 9%. Kasumiks arvestasin 12%. Sellise kasumiprotsendi juures on kapitalimahutuste tasuvusaeg 1,5 aastat, mis on hea tulemus. Lõputöös püstitatud eesmärgid said täidetud ja arvan et antud lõputöö tulemust saab kasutada ettevõtte konkurentsivõime tõstmiseks. Saadud kogemust saab kasutada tulevikus ka ettevõtte teiste osakondade kaasajastamisel.

Abstract [en]

The subject of the present thesis is the modernisation of the production line for the ventilation ducts. In this context, new equipment were chosen and a new technological flow scheme was drawn up. The most appropriate location for the new machine-tools in the existing production building has been found, according to the technological flow scheme. On the production line plan, the machine-tools are placed in the way that the tracks of movement of blanks are as short as possible and the production process is smooth. The possibility to increase the production volume in the future has also been taken account. In the present thesis we have also developed necessary tools to increase the efficiency and to achieve the desirable result. Changing the production technology for support angles has allowed to reduce five times the production time, which is a good result. To reduce the number of staff, we have developed a jig for the production line, in the result of which the production of one item now needs 2 workers instead of 4. In the result of the modernisation of technological processes, the new time necessary for the production of one item is 34 minutes, which is 27% shorter compared to the result achieved with the existing production process. This gain is sufficient to achieve a competitive cost price. The new cost price for an item is 56,28 EUR and thus the cost price has fallen 9%. According to our calculations the profit would be 12%. With this profit the pay-back period for capital formation is 1,5 years, which is a good result. The objectives defined in this thesis have been achieved and according to us, the result of this thesis can be used to increase the competitiveness of the enterprise. This experience can be used in the future to modernize also other divisions of the enterprise.

Item Type: thesis
Advisor: Marek Pakkin
Co-advisor: Martin Põldmäe
Subjects: Mechanical Engineering > Production Engineering and Technology
Divisions: Institute of Engineering > Machine Building
Depositing User: Lauri Varind
Date Deposited: 08 Jun 2015 06:27
Last Modified: 08 Jun 2015 06:27
URI: http://eprints.tktk.ee/id/eprint/1128

Actions (login required)

View Item View Item